Opening and re-establishing a main street and making asphalt mixtures

Posted on: Tue, 06/20/2023 - 14:23 By: admin
Opening and re-establishing a main street and making asphalt mixtures
Design idea:

The work includes plowing, emptying and leveling an existing layer with an area of 25,700 square meters, supplying a layer of mattresses with a thickness of 20 cm and an area of 25,700 square meters, implementing a hot asphalt mixture with a thickness of 6 cm, executing kandarins and cement tiles with a length of 1100 m, a width of 1.10 m, and executing 8 tubular culverts, with a total value of (289,353 dinars).

Work description:

Executed by Mansour Issa Al-Aqayla and his partner, under the supervision of the Projects Department / Greater Ma'an Municipality